Chinese
 
 
 
 
 
 
 
   
 
 
     
 
  Introduction  
  The Inventor  
  System Concept  
  Vertical Construction Joints  
  Mould Preparation And 
Casting
 
  Versatility  
  Installation Procedures  
     
  READ MORE  
     
  Our Portfolios  
   
  1 1/2 Storey Villa, 2 Storey Villa, 2 1/2 Storey Villa, 5 Storey Apartment, 2 Storey Town's House, 2 1/2 Storey Links Houses...  
   
     
  Report By University  
   
  Comfortable built environment is one of the intentions of building a house. Hot and humid climate condition of Malaysia requires a good design and...  
   
     
  Granted Patents  
   
  Granted patents of Malaysia, United State, European, People Republic of China, Australia, New Zealand, Egypt, African Regional Industrial...  
   
     
 
Installation Procedures

Prior Installation
1. Check the condition of the floor and mark the grid line and off-set line.
   
2. Lay the level pad along the grid line for level control.

Panel Installation
1. Apply expandite concrete along the panel position prior installation.
   
2. Install the panel to its respective position.
   
3. Check the vertically and horizontally of the panel before tighten the steel bracing.
   
4. Tighten the steel bracing to hold the panel.
   
5. Remove the axcess expandite concrete.
 


Procedures to install and erect O-Stable Panel System's column
- Install column formwork
- "L" column has been formed after concreting



Proposed 3 1/2 Storey Split Level Bungalow At Kajang

 
 
 
  IMPORTANT NOTICE: All rights are reserved. Information provided herein (not limited to illustrations, methods, formulae, etc) may be protected by patent rights and other intellectual property rights. No reliance should be based on the information in any construction projects unless specific advice in writing has been obtained from O-Stable Panel Sdn Bhd. © Copyright 2011 O-STABLE PANEL SDN BHD. All rights reserved. Designed by Netbusiness Solution.